-
Geza Lore authored
The transform can only be skipped if both Y and U/V can be skipped, so we always include the cost of tx size in the rate for Y. This will get later subtracted if the transform is actually skipped. Change-Id: I136a223e5596f18b69bb9f743e7e08438183a215
b87078d5